Gary and Joe Shiver spent the day putting plywood on the west side of the house. It rained today but we were under cover.
This is the first view of the west side showing the wall covered.
This is the dining room looking west.
This is the kitchen.
The fireplace from the living room looking toward the dining room.
Looking down the back porch.
The bottom 2 feet of each wall is covered by 3/4 inch treated marine plywood. The top 8 feet is covered with CDX quality 3/4 inch plywood. The studs are 2 x 6 nailed on 16 inch centers.
The house from the street. Tomorrow the plywood will be on this wall.
The plywood must be nailed every 4 inches with ringed alloy nails.
No comments:
Post a Comment