Cousin Josh and Gary Wayne just starting the front side of the roof
Cutting off the trusses - for the 2 foot overhang. A large overhang prevents water form splashing up on the sides of the house. It also provides shade.
At the end of Day 25 - 2/3rds of the roof was done
Florida Hurricane Code requires steel support straps all over
The next undertaking will be the attic floor and steps. With the exception of the liquid foam in place insulation - the attic will be complete except for the ends.
Big Bend Truss came to take their truck away today.
We will have one more visit of the crane. It will be used to raise the top hat trusses in place.