Starting the rebar lattice |
Wednesday they started the work on the rebar lattice in the pool floor and walls. They also started on putting plumbing in the bottom. Code requires 2 large drains in the pool - to prevent too much suction in one drain - and be a safety risk.
The concrete will be laced with rebar - at least every 15 inches. There is already one foot of crushed stone in the bottom. At least 8 inches of concrete will be poured on that to make contoured floor to flow to the drains.
We plan to pour the floor on Monday.
The tents has protected the job site from sun - but also from the intermittent rain.
No comments:
Post a Comment