Wednesday, April 05, 2006

It was a Great Day for Pouring Concrete - Footer Done




The building inspector came at 11AM. He gave us approval to pour the concrete footer over the steel cages. At 1:30PM the concrete truck arrived. It is the first time I have seen concrete coming through a hose. In about two hours everything was done. Next step is to build the block foundation on top of the footer. You will notice that there are steel rods that are sticking up about 2 feet out of the footer. This rods will go inside the holes in the concrete blocks. So far the weather has been perfect for building - no rain - low humidity - temperature in the 70s and 80s.