The pantry is lined with shelves from floor to ceiling. There is also a slot for a freezer.
It cooled down in Florida today - never got up over 60. Good thing there is plenty of work to do inside the house.
Today Lulu and I went to Home Depot and brought all of the electrical fixtures - outlets - switches - switch plates.
Meanwhile Garys2 worked on the the closets and shelves. The tile guy started laying out the showers.
This is the master bath shower being line with mud board.
The linen closet by the master bedroom is full of shelves.
My cabinets and shelves are complete in the master suite.
The bedroom 2 shelves are ready for a final coat.
Another view of the linen closet.
Blue and white tile is for the master bath floor. It will flow thru the closet to the laundry. The white subway tiles will be in the shower and on the walls around the tub.
The stand alone tub will be surrounded by tile - with this stuff on the floor.
This drive-in shower will be shaped with mud and lined with tile. It will have a small seat in the corner.
No comments:
Post a Comment