As of today - Friday - the final roof shingles will be put on. What is left outside? Pour the concrete pads on the two porches - put the steps up to the second floor - build and install the custom pocket door - stucco the foundation.
Inside - electrical work - plumbing - bathroom - kitchenette - AC/heat - drywall - wood floor upstairs.